Description:

This Car Park for Manchester Airport situated between Styal Road and Shadow Moss road commenced in February 2014 and was completed in December.

This was one of the first projects undertaken by Galliford in a new framework agreement with Manchester Airport Group. A wet autumn and early winter period had left the site sodden, causing many problems and eventually leading to the requirement for ground Stabilisation to be introduced. TPS, working in co-operation with the Stabilisation contractor successfully carried out the Earthworks, drainage and granular surfacing works throughout this period.

Subcontract works:

48000 m3 of topsoil strip either placed in landscape or removed from site

15000 m3 of cut material

Excavation of ponds circa 5000m3

25000 m3 in fill to make up levels

3600m of various small diameter drainage pipes

1800m of 1200mm diameter storm retention drainage pipes

85 No manholes

163,500 m2 granular surfacing to parking bays

20,000 m2 foundation to enhanced tarmac entrances and bus routes

Contract Constraints

Control of birds in aeroplane flight paths

Restricted headroom working in parts of the site

Construction of borrow pits on site to win suitable materials for filling operations.

Control of ground and surface water during construction. (No outfalls available)

Area B Car park – providing parking for 9000 cars

Employer: Manchester Airport Group

Main Contractor: Galliford Try Infrastructure Ltd

Value: £1,500,000