all projects

Description:

TPS have worked with Balvac (a subsidiary of Balfour Beatty) to complete the compound set-ups and decommissioning associated with Various Bridge repair projects.

Subcontract works:

TPS have installed compounds for Balvac at Peover, Barton, Uttoxeter and Dorchester – all varying in size and with different TM constraints.

TPS scope of works included the following:

  • Site clearance
  • Removal / treatment of invasive species
  • Topsoil strip
  • Earthworks cut / fill
  • Supply and install geotextiles
  • Supply and install geogrids
  • Supply and installation Type 1 MOT
  • Disposal of MOT on completion of the works
  • Reinstatement of topsoil / grass seeding

Employer: Various

Main Contractor: Balvac

Form of Subcontract: NEC3 Option B

Value: £250k (combined)